<div dir="ltr"><div>Hi all,</div><div><br></div><div>I'm trying to figure out how to set up a transformation pipeline in MapServer where I apply a grid shift.  Any ideas <br></div><div><br></div><div>Step 1 UTM z17 NAD83 CSRS (EPSG:2958) to UTM z17 NAD83 Original (EPSG:26917).  </div><div><br></div><div>Example using cs2cs</div><div>cs2cs +init=epsg:2958 +to +proj=utm +zone=17 +datum=NAD83 +nadgrids=./ON83CSv1.gsb  -v -E -I<br># ---- From Coordinate System ----<br>+proj=utm +zone=17 +datum=NAD83 +nadgrids=./ON83CSv1.gsb<br># ---- To Coordinate System ----<br>+init=epsg:2958<br>500000 4500000<br>500000 4500000  500000.15       4499999.63 0.00<br><br></div><div><br></div><div>Step 2 UTM z17 Original (EPSG:26917) to Web Merc (EPSG:3857)</div><div><br></div><div>cs2cs +init=epsg:26917 +to +init=epsg:3857  -v -E -I<br># ---- From Coordinate System ----<br>+init=epsg:3857<br># ---- To Coordinate System ----<br>+init=epsg:26917<br>500000.15 4499999.63<br>500000.15 4499999.63    7357712.08      9347073.72 0.00<br><br></div><div><br></div><div><br></div><div><br></div></div>