Hi<br><br>Our master branch has received lots of commits since 2.11. We have added new features, and made major enhancements and refactoring. So I think it&#39;d make sense to plan releasing 2.12. We could target feature freeze in two weeks, and actually start the release process at that time.<br>
<br>What do people think?<br><br>Thanks,<br><br>PS: I can also propose to manage this release, and tidy up our release process along the way.<br><br>-- <br>Eric Lemoine<br><br>Camptocamp France SAS<br>Savoie Technolac, BP 352<br>
73377 Le Bourget du Lac, Cedex<br><br>Tel : 00 33 4 79 44 44 96<br>Mail : <a href="mailto:eric.lemoine@camptocamp.com">eric.lemoine@camptocamp.com</a><br><a href="http://www.camptocamp.com">http://www.camptocamp.com</a><br>
<br>