<div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">FYI</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">This is the datacenter where most of our equipment resides. Most of the servers have their power balanced between the two UPS units, so in case of an actual power outage, we shouldn't be affected (except for a few rare exceptions).</div><br><div class="gmail_quote"><div dir="ltr">---------- Forwarded message ---------<br>From: <strong class="gmail_sendername" dir="auto">Fowler, Stephen Lee</strong> <span dir="ltr"><<a href="mailto:steve.fowler@oregonstate.edu">steve.fowler@oregonstate.edu</a>></span><br>Date: Thu, Jan 17, 2019 at 9:02 AM<br>Subject: [Kerr_b210-announce] B210 Data Center Maintenance<br>To: <a href="mailto:kerr_b210-announce@lists.oregonstate.edu">kerr_b210-announce@lists.oregonstate.edu</a> <<a href="mailto:kerr_b210-announce@lists.oregonstate.edu">kerr_b210-announce@lists.oregonstate.edu</a>><br></div><br><br>All,<br>
<br>
We will have UPS contractors in B210 this morning performing some necessary battery replacement on the UPS units.  The UPS units will be in bypass during the maintenance.  They will work on one unit at a time so both units will not be off-line at any one time.<br>
<br>
Maintenance is expected to take about 2-3 hours.<br>
<br>
Regards,<br>
Steve Fowler<br></div><div><br></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><font face="arial, helvetica, sans-serif">Lance Albertson</font><div><div><font face="arial, helvetica, sans-serif">Director</font></div><div><span style="font-family:arial,helvetica,sans-serif">Oregon State University | </span><span style="font-family:arial,helvetica,sans-serif">Open Source Lab </span></div></div></div></div></div>