<div dir="ltr"><div dir="ltr"><div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">All,</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">The building that our primary data center is housed in (Kerr Administration Building) is having some work done on it's power grid [1] between March 28 and 30 this week. While this work is being done, the data center will be powered via the generator and we <b>DO NOT</b> expect any outages to happen. However, in case something unexpected happens, I wanted to send this notice out.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Here is a note from OSU about this work (all times are PDT):</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><font face="arial, helvetica, sans-serif">Oregon State University and Pacific Power have been collaborating on a long-term effort to improve the safety and reliability of the power grid serving the Corvallis campus. This work requires periodic planned power outages to accommodate upgrades and other work.</font></blockquote><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><font face="arial, helvetica, sans-serif"><br></font><span style="font-family:arial,helvetica,sans-serif">The first multiple-day planned power outage will occur on <b><span class="gmail_default" style="font-family:arial,helvetica,sans-serif"></span>Thursday, March 28 beginning at 6 a.m. and lasting through Saturday, March 30 at 6 p.m.</b> The work to be performed by Pacific Power includes replacing switches and cables that feed various buildings along SW Jefferson Way. Prior to this planned outage, OSU’s Facilities Services electricians will briefly shut down power to the affected buildings outside of business hours on March 16, 2019 to enable the hook-up of generators, allowing for business continuity in most buildings.</span></blockquote><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">If you have any additional questions or concerns, please contact me directly either via email or IRC.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Thank you!</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">[1] <a href="https://powergrid.oregonstate.edu/" style="font-family:Arial,Helvetica,sans-serif">https://powergrid.oregonstate.edu/</a></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div>-- <br><div dir="ltr" class="gmail_signature"><div dir="ltr"><font face="arial, helvetica, sans-serif">Lance Albertson</font><div><div><font face="arial, helvetica, sans-serif">Director</font></div><div><span style="font-family:arial,helvetica,sans-serif">Oregon State University | </span><span style="font-family:arial,helvetica,sans-serif">Open Source Lab </span></div></div></div></div></div></div></div>