<div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">All,</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">The University is in the middle of doing a variety of power grid updates [1] to campus which impact the building our datacenter is in (Kerr Admin). <b>This should not impact any production services since the data center will be on generator power</b> however I like to notify everyone just in case something goes wrong. Our building will only experience <i>limited</i> electrical service interruptions and will be without power for approximately two hours at the start of the project (Thursday, September 5 from 5-7am PDT (1200-1400 UTC)) and two hours at the end of the project (Friday, September 6 from 5-7am (1200-1400 UTC)).</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">If you have any questions please let me know.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">[1] <a href="https://powergrid.oregonstate.edu/" style="font-family:Arial,Helvetica,sans-serif">https://powergrid.oregonstate.edu/</a></div><div><br></div>-- <br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><font face="arial, helvetica, sans-serif">Lance Albertson</font><div><div><font face="arial, helvetica, sans-serif">Director</font></div><div><span style="font-family:arial,helvetica,sans-serif">Oregon State University | </span><span style="font-family:arial,helvetica,sans-serif">Open Source Lab </span></div></div></div></div></div>