[OpenLayers-Dev] RC time?
Eric Lemoine
eric.lemoine at camptocamp.com
Mon May 9 01:36:08 EDT 2011
On Saturday, April 16, 2011, <christopher.schmidt at nokia.com> wrote:
> Is it time to do an RC for 2.11? I was waiting for
> http://trac.osgeo.org/openlayers/ticket/3258 to change state, since
> it's marked for 2.11; should I go ahead without it, just grab it,
> something else?
Hi Chris, and all
How can we move forward with the RC? Since Chris' email some tickets
have been set to Review. Should we have an IRC meeting to look at
these tickets, assign them to people, and hopefully move forward with
2.11?
Thanks,
--
Eric Lemoine
Camptocamp France SAS
Savoie Technolac, BP 352
73377 Le Bourget du Lac, Cedex
Tel : 00 33 4 79 44 44 96
Mail : eric.lemoine at camptocamp.com
http://www.camptocamp.com
More information about the Dev
mailing list