[OpenLayers-Dev] Re: 2.11 SketchStarted
Xavier Mamano (jorix)
xavier.mamano at gmail.com
Thu Mar 8 14:37:36 EST 2012
Hi Rich,
I did not read carefully enough the last part of your message. About
"beforesketchstarted" I think it's better to be called "sketchcreated".
"beforexxxx" usually is associated with the option to cancel by return
false.
>From 2.11 sketch is usually created before starting, and is a problem not
knowing when it starts (first point). In this we agree.
Best regards,
Xavier
rgreenwood wrote
>
>
> fell_runner wrote
>>
>> Ok that does work.
>>
>> But it still seems [to me] a [very] non-intuitive way of catching the
>> users first drawing point on a line.
>>
>> Thanks for your help.
>>
>
> I'm with fell_runner on this. I had been relying on the sketchstarted
> event to catch the first drawn point of an object until the 2.11 change in
> behavior. I can see the need to detect that the user is going to drawn an
> object, but I think a new event such as beforesketchstarted might have
> been a more graceful way of handling it.
>
> Best regards,
> Rich
>
--
View this message in context: http://osgeo-org.1560.n6.nabble.com/2-11-SketchStarted-tp4550864p4559721.html
Sent from the OpenLayers Dev mailing list archive at Nabble.com.
More information about the Dev
mailing list