AW: [Qgis-developer] Next release name - 'Metis'

Paolo Cavallini cavallini at faunalia.it
Fri May 16 01:53:33 EDT 2008


Tim Sutton ha scritto:

> Based on this I'm thinking we probably need to start feature freeze as
> of end of next month (June) or so. And string freeze 15 days after
> that. Based on that timing we have maybe one more point release we can
> squeeze out before 1.0 is announced.

In this case, we'll be missing advanced labelling, right?
More generally, IMHO it is better first to list the feature we *want* in
1.0, then estimate the possible time for freezing.
I proposed a list, anyone agrees with that?
All the best.
pc
-- 
Paolo Cavallini, see: * http://www.faunalia.it/pc *



More information about the Qgis-developer mailing list